Ohio EPA Service Line Inventory Sheets Now Available

The Ohio EPA has revised the Lead and Copper Rule for public water utilities. With the new regulations, water systems were required to create an inventory of existing service line material both on the utility side of the water meter pit and the customer side, from the meter pit into the house. Plumbing material inside buildings is also required information. The goal of this rule is to minimize the risk of exposure to lead and copper in your drinking water. The drinking water we produce does not contain lead and copper, however the piping in your service line and indoor plumbing may contain these metals which can leach into your drinking water.

The result of our inspections of the system over this past year are now available. The Duvall (also known as JEDD) area, which mainly consists of warehouse facilities in the Rickenbacker area, and our primary serviced area can be viewed at anytime.

Posted in News and Events.